Meigs, Inc. Building Specialists Proud to Build
John Wick Homes      Wick Buildings
We CHOOSE to build better!
HOME PAGE
HOMES
View Homes
View Floor Plans
View Lots
Sold Homes
Virtual Tours
REMODELING
BUILDINGS
Commercial
Agricultural
Equine
Suburban
Turn Key
Metal Roofing
Post Replacement
Color Selector
INFORMATION
Associations
Request Free Literature
Testimonials
Events & News
Map
Employment
Contact Us
Privacy
 
 
 
 
 
 
 
 
 
 
 
 
 

Panelized Homes

 

Why Panelized?
What do experts say? Better Homes & Garden Magazine’s annual Home Design Contest, Better Home Better Living™ recently discovered what we have known for more than 40 years!

Here is what they say: "The preferred framing and insulation system of the future. It has so much value."

"Imagine a house where walls and doors are perfectly plumb. Where floors don’t squeak, and the whole house doesn’t rumble during your morning exercise. Imagine a house with a building envelope so tight that you can save thousands a year on heating and cooling costs. Think of having a customized, innovative house that, once it’s foundation has been set, can go up in about a week. (That’s right, a week!)"

"Through our research and by working with San Francisco-based architect Toby Long – designer of our Better Home Better Living™ house – WE’VE BECOME BELIEVERS IN PANELIZED CONSTRUCTION.

These energy efficient, factory engineered wall, floor, and roof panels add to structural soundness, building speed and efficiency, unlike anything possible with traditional walls made on-site with wood studs. And through energy efficiency, the house can save up to 33 percent a month, thanks to the supreme engineering and insulation that panelized construction offers.

Homeowners spend less on upkeep because of this high performance system and durable, low maintenance materials. "It holds up to extreme weather conditions and virtually needs no painting," the architect says."

What Better Home Better Living™ just learned, we have known and built for OVER 40 YEARS!!

What is Panelized?

Floor Joists – Ready for T & G Floor Deck, Glued and Screwed
Floor Joists – Ready for T & G Floor Deck, Glued and Screwed

Panelized means the wall "panels" and floors are built in a controlled indoor environment under ideal conditions. Precision equipment makes perfect cuts every time. Skilled craftsmen work on level construction surfaces, designed for maximum efficiency. The result is square corners, tight joints and plumb level surfaces. Conditions and results that traditional "on-site, stick builders" can only dream of. These advantages are the same reason even "on-site, stick builders" have roof trusses built in "truss plants," much like our facility.

These wall panels and floor deck sections are loaded onto specially designed vehicles, covered for protections from weather, and delivered to the waiting foundation. In days, your home is completely enclosed and protected from the elements.

     

THERE IS MORE...before we load and ship the wall panels we use our ideal indoor building facility to install moisture/vapor barriers (Tyvek), windows, doors and siding. Again this is done in conditions that "on-site, stick builders" can only dream of, with results almost impossible for them to achieve. Our craftsmen are not working on ladders or scaffold. They are on solid ground at properly equipped work stations. They are properly trained and we have multiple quality checks and inspections in each phase of the process.

Work Station Wall Sheathing (No Foam)
Work Station Wall Sheathing (No Foam)
Exterior Wall/Siding/Window - Complete
Exterior Wall/Siding/Window - Complete

Window Caulking before Flashing Tape/Side

John Wick Homes back up their process with a STRUCTURAL WARRANTY THAT IS 10 TIMES LONGER than the standard 1 year warranty. The home is supported by strong steel I beams, not laminated wood products. "Supreme engineering" is what – the experts call it.

Click here to view a slide show of the entire process.

Our Quality of Materials and "Green Building" efforts
We use the best quality materials and components available. Names you know and trust like Kohler, Lennox, Merillat, Weyerhauser, WeatherShield, Certainteed, Western and many others.

Our building materials do not lie in the mud on uneven surfaces, exposed to the elements, like "on-site, stick builders."

Our materials are protected from the elements, stored properly to prevent warping or other damage.

We use only the "best of the best" lumber. Our high volume priority account status with suppliers means we get the best materials they offer. Natural products like lumber often do contain defects, even in what we receive. We return materials that do no meet our high standards. The suppliers then sell them to others.

"On-site, stick builders" just generally use what is delivered, they seldom take time to return or exchange material. At John Wick Homes, each craftsman has the responsibility to reject any questionable material, the JWH directive is "Build Each Home as if it were Your Own!" There are even signs posted saying just that.

Even the scrap material is used for blocking in walls so there are solid surfaces to attach cabinets and window treatments to.

Remaining bits of lumber are offered free to local people to take and use for firewood or any other purpose. We recycle everything we can, even our vinyl/siding scraps.

Expertly Engineered: Proven Designs and Methods (40 years!)
Our level of expert engineering far exceeds the standards of homes to be "on-site stick built." Everything we do is "exact" and fits in place as it was designed and built in our facility. Counter tops are even pre-cut, unheard of in the "on-site, stick built" world.

No need to worry about the typical problems of "on-site stick built" home. All of our homes have been built many times, no surprises! Our methods and engineering leave nothing to doubt, "Supreme Engineering" sums it up well.

We achieve extraordinary energy efficiency in our homes, commonly exceeding Wisconsin Energy Star Standards by 40% to 60%! You’ll realized thousands of dollars a year in energy savings. See our Energy Advantage Page for more information.

Our process allows us to move very quickly, usually completing our homes in less than half the time of "on-site stick built" homes. Most new homeowners can move in about 60 days or even less.

We refuse to follow the engineering trend today to sacrifice the structural integrity of the homes (profit motive) by moving wall studs to 24” apart, single top plates walls, single stud window framing, removing window headers, remove jack studs at windows, exterior walls of Styrofoam and so on. We would not build our own home that way, so we won’t build yours that way either!

Why are Meigs built John Wick Homes the Best Panelized Home?
Extraordinary Engineering – built strong, with proven methods and designs. "Supremely engineered," say the experts. Building codes are not our limits but rather our Minimums! Every home we build Exceeds Wisconsin Building Code and regular building standards by over 150 ways!

Our Structural Warranty is 10 times longer! Simply put...We Choose to Build Better! Exceptional Quality and Value...Guaranteed!